Filter Search


Asia


Location Summary Deadline
India The Project Involves The Supply Of 50 Units Of 50mva 132/33kv Power Transformers, Which Includes Various Lots With Specific Quantities And Technical Specifications. The Transformers Are Designed For Efficient Operation With Features Such As On-load Tap Ch 2026-04-27
-Renovation-And-Modification-Of-Control-Room-Of-Power-House-And-Dam-With-F>India -Renovation-And-Modification-Of-Control-Room-Of-Power-House-And-Dam-With-F>Renovation And Modification Of Control Room Of Power House And Dam With False Ceiling, Panelling Of Wall, Flooring And Construction Of Server Room Of Dhauliganga Power Station
Renovation And Modification Of Control Room Of Power House And Dam With F
-Renovation-And-Modification-Of-Control-Room-Of-Power-House-And-Dam-With-F>2026-04-27
India Auction Sale Of Plot No.7 Area 860 Square Feet*#. Property No.1 Schedule Of Property: - (vide Loan A/c No.1163) All That Piece And Parcel Of Plot No.7 Gram Panchayat No.4508 And Digital/swattin No.150400300400107497 Measuring East - West 43 Feet And North 2026-04-27
India Densified Thermal Bonded Polyester Block .#* Densified Thermal Bonded Polyester Blocks For Long Lower Berth To Rdso Specn. C-k607 Re v. 2 With Amendment-1 Of August 2016 To Size 38 X 565 X 850 Mm To Icf Drg. No. Scn6-6-1-610 Alt. U/2 I tem 6. [ Warranty P 2026-04-27
Saudi Arabia Establishment, Operation, And Maintenance - Commercial Activities - Retail Stores - Cafeteria 2026-04-27
Thailand Bidding For Construction Contract For Turnkey 22 Kv Underground High Voltage Distribution System In The Pang Mu Bridge Area. Mueang Mae Hong Son District Mae Hong Son Province According To Kp.c.1 By Means Of Electronic Bidding (e-bidding). 2026-04-27
India Tender Invited For Handling And Transport On Lumpsum Basis - Handling & Transport Service##quantity: 1## 2026-04-27
India Locomotives Inside And Outside Enamel Painting In Poh Locos At Locoworks, perambur, Chennai. 2026-04-27
India Supply Of Nitrogen Cylinder .#* Supply Of Nitrogen Cylinder Of Capacity-50 L,200 Bar With Pressure Gauge Fitted With Fire Rate d Automatic Fire Suppression Activation Solenoid Valve With Manual Over Ride Lever Duly Fitted With Nitrogen at 200 Bar +/-10% . 2026-04-27
Japan Cardiovascular Angiography System Complete Set 2026-04-27
Whats app