Filter Search


Asia


Location Summary Deadline
-03-Interlocking-And-Drain-Construction-Work-From-Vimala-Devi-Sarpanch-House-To-2-Hdp-Road.>India -03-Interlocking-And-Drain-Construction-Work-From-Vimala-Devi-Sarpanch-House-To-2-Hdp-Road.>03 Interlocking And Drain Construction Work From Vimala Devi Sarpanchs House To 2 Hdp Road.
03 Interlocking And Drain Construction Work From Vimala Devi Sarpanch House To 2 Hdp Road.
-03-Interlocking-And-Drain-Construction-Work-From-Vimala-Devi-Sarpanch-House-To-2-Hdp-Road.>2026-04-23
Philippines 26ka0030 Construction (completion) Of Multi-purpose Building, Purok 1, Barangay Halapitan, San Fernando, Bukidnon (125.323588º, 7.924833º) Purok 1, Barangay Halapitan, San Fernando, Bukidnon 2026-04-23
India Heat Convector For Drivers Cab As Per Specification .#* Heat Convector For Drivers Cab As Per Specification- Power 2.0 Kilowatt, Input Voltage-110 V olt Dc, Output Voltage For Centrifugal Blower & Heater Is 230 Volt Ac. Temperature Cutoff-30 Degree Celsiu 2026-04-23
India Gangway Bridge Mounting Complete .#* Gangway Bridge Mounting Complete To Icf Drg No: Lwsczac-2-5-054, Col-ii Alt: F. Note: For Item Bridge Sheet, Icf Drg. No. lwsczac-2-5-026, Alt-a Is To Be Followed. [ Warranty Period: 30 Months After The Date Of Deliver 2026-04-23
Nepal Sikre/sisau Bajar Protection Works, Tinpatan Rural Municipality-1, Sindhuli 2026-04-23
India Repair/replacement And Maint Of Lt Over Head And Under Ground Distribution Line At Zone-i Area Of Tibri Mil Stn Under Ge Gurdaspur. 2026-04-23
India Slide Plate Assembly For Holder Support .#* Slide Plate Assembly For Holder Support As Per Annexure-a Attached. [ Warranty Period: 30 months After The Date Of Delivery ] ] 2026-04-23
India Dense Avenue Plantation Advance Field Preparation, Planting And Maintenance Works Along 4l Of Palma To Gumla From Km. 26.000 To Km.40.000 Of Nh 23 Under Piu Gumla, Regional Office Ranchi In The State Of Jharkhand 2026-04-23
Philippines Consultancy Services In The Development Of A Real-time & Centralized Water Accounts Database System Phase 1: Groundwater Extraction(water Permittees With Telemetered Water Meters)-second Bid 2026-04-23
India Relay Over Load For Silicon Rectifier .#* Relay Over Load For Silicon Rectifier(qrsi-1&2). ,clw/es/r-27/ Z [ Warranty Pe riod: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Per 2026-04-23
Whats app