Filter Search


Asia


Location Summary Deadline
India Execution Of S&t Work In Connection With 1) Hatia -extension Of Mechanised laundry Hatia Of Ranchi Division, 2) Hte: Up-gradatation Of Maintenance Facilities at Old Sick Line Of Coaching Depot Hatia, 3) Upgradation / Improvement Of Rolling examination Fac 2026-12-01
India 16 2026-12-01
India Wooden Packing .#* Wooden Packing 300x300x75 Mm Having Specifications As Per Attached Annexure A [ Warra nty Period: 30 Months After The Date Of Delivery ] ] 2026-12-01
India Supply Of Materials Materials 2026-12-01
India Supply Of Gas Analyser (head Space Gas Analyser) Gas Analyser(head Space Gas Analyser), Commercial Idli Steamer, Arterial Blood Gas Analyzer (v2), Power Analyser, Breath Analyser, Moisture Analyser, Single Burner Gas Range (for Deep Fryer), Copper Cable A 2026-12-02
India The Contract Involves The Supply Of Materials And Stores As Specified In The Contract, Ensuring They Meet Quality Standards And Specifications. The Contractor Is Responsible For Delivering Brand New Materials, Maintaining Stock Levels, And Complying With 2026-12-02
India Supply & Maintenance Of Motorized Double Hand Drive Tricycle For Persons With Disabilities (pwds) Of Locomotor Category Motorized Double Hand Drive Tricycle 2026-12-02
India Repairing/servicing Of Marine Gear Box (port Side) Of Pt Tilak Marine Gear Box 2026-12-02
India The Contract Involves The Supply Of Materials And Stores As Specified In The Contract, Ensuring They Meet Quality Standards And Specifications. The Contractor Is Responsible For Delivering Brand New Materials That Comply With The Required Specifications A 2026-12-02
India Amc Of Computers And Peripherals Computer Printer 2026-12-02
Whats app