Filter Search


Asia


Location Summary Deadline
India Supply & Fitment Set Of Etl Items For 50 Nos. Lhb Ac Coaches .#* Supply & Fitment Set Of Etl Items For 50 Nos. Lhb Ac Coaches. 01 Set Consists Of 06 Nos. Items (a). 1.5 sq Mm E Beam Cable 1.8 Kv- 56 Mtr. (b). Indication Lamp - 01 Mtr. (c). Auxiliary Conta 2026-04-30
India Roxithromycin 150 Mg Oral Tablet .#* (ph No.:06077) Roxithromycin 150 Mg Tab [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: Max 8 Lacs ] [ Rate Of Supply 544 Units Per Month , Commencement Time Allowed -1 2026-04-30
India 32-construction Work Of Interlocking Tiles And Drainage In Yusufa Village From Naresh Valmiki S Home To Veer Singhs House. Mp-bijnor 2026-04-30
India Construction Of Fpe On Mayabati Left From Rd 1450m To 1870m Near Patanagarh Town 2026-04-30
India Auction Sale Of Lot No - 23.0 Lot Name - C&r Panel, Triple Feeder, 36kv Product Type - Electrical Items Category - Others - Cat089_others, Lot No - 24.0 Lot Name - Energy Meter, 3-phase, 4- Wire, Non-abt Product Type - Electrical Items Category - Meter Sc 2026-04-30
India Auction Sale Of Lot No - 01 Lot Name - Old Box Product Type - Miscellaneous Category - Paper And Related Products Sub Category - Others 2026-04-30
10-Kva)-With-Battery-(q2)-,-Online-Ups-(?10-Kva)-With-Battery-Conforming-To-Is-16242-(part-1)-(q2)##quantity:-2##>India 10-Kva)-With-Battery-(q2)-,-Online-Ups-(?10-Kva)-With-Battery-Conforming-To-Is-16242-(part-1)-(q2)##quantity:-2##>Tender Invited For Online Ups (>10 Kva) With Battery (q2) , Online Ups (?10 Kva) With Battery Conforming To Is 16242 (part 1) (q2)##quantity: 2## 10-Kva)-With-Battery-(q2)-,-Online-Ups-(?10-Kva)-With-Battery-Conforming-To-Is-16242-(part-1)-(q2)##quantity:-2##>2026-04-30
India Const. Work Of Interloking Block Road From House Of Shubham Kumar To Sanjeev Arora Ward No.02 At Gharsana 2026-04-30
China Construction Of A Coastal Port Hydrological Smart Perception Platform And Equipment Procurement Project 2026-04-30
India Conducting Instrumentation To Verify/validate/compute Rail Structure Interaction analysis For Continuation Of Lwr Of Bridge No. 173(4x18.3 M Cg) B/w Gkc-khm & bridge No. 176(3x12.2 M Cg) 3rd Line Gkc-gkp In Connection With Dmg-gkp-gkc- khm 3rd Line Projec 2026-04-30
Whats app