Filter Search


Asia


Location Summary Deadline
India Construction Of Vidisha Railway Station Madhav Ganj Chouk Main Road To Pedi School, Chanakya Road To Bajariya Jhaki Chouk Via Shivaji Chouk Length 2.30 Km. Pac 663.82 Lacs 8th Call On Road And Bridge Sor 11-04-25 Work Period 300 Days 2026-05-18
India High Pressure Cutout /switch Direct Mounted Type (cartridge Pressure Control) conf. To Rdso Spec. No. Rdso/pe/spec./ac/0061-2005 (rev-1) Suitable For Lhb type Rmpu Of Ac Coaches. .#* High Pressure Cutout /switch Direct Mounted Type (cartridge Pressure Con 2026-05-18
India Repairing & Calibration Of Tool Presetter Machine Mw No. M1407 2026-05-18
Syria Arab Republic Supplying Clothing (trousers - Shirts) Needed By Workers At Hayyan Oil Company. St Cft – Hpc- 004/admin/fields/261 Order File No.: 2026-05-18
Philippines Installation Of Solar Street Lights In Provincial Road, Barangay Cambalo, Cajidiocan Provincial Road, Cajidiocan, Romblon 2026-05-18
India Construction Of Library Hall At Science College Raipur(c.g.) 2026-05-18
India Survey, Supply, Transportation, Erection, Testing And Commissioning For Permanent Restoration Of Infrastructure Damaged Due To Flash Floods In The Month Of Aug 2025 In Respect Of Puldoda And Shiva Feeders Of Electric Sub Division Ii Doda Under Th 2026-05-18
India Auction Sale Of Land Admeasuring 48.06 Ares Along With Building*#. 1. All That Part And Parcel Of Land Admeasuring 48.06 Ares (13.26 Ares (as Per Deed 13.75) 6.88 Ares +9.71 Ares 18.21 Ares) Along With Building Thereon In Vaikom Municipality Admeasuring 2 2026-05-18
Nepal Construction Of Eps Panel Room With Black Pipe Roof Truss & Seepage Control Work At Tmd 2026-05-18
Nepal Namgung Saldang Irrigation Project 2026-05-18
Whats app