Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Arsenic Free Water Treatment Plant Sajal Dhara At Senpur Shyamnagarpara Sansad 13 Under Chakdignagar Gp 2026-05-04
India Upgradation Of Sajaldhara By Solar System Replace Of Electric At Mundumalapara In Front Of Samabay Bank 2026-05-04
India Construction Of Cover Drain From Uttar Ghosh Para Kalitala Towards Ho Uday Ghosh 2026-05-04
India Connecting Dome As Per Crw/mcs Drawing .#* Connecting Dome As Per Crw/mcs Drawing No. Mw-m-1-16 Alt.2 Item No. C (07, 08, 09, 10) I n Assembled Condition [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-05-04
India Upgradation Of Sajaldhara By Solar System Replace Of Electric At Digha Bagpara Masjid 2026-05-04
India Installation Of Sajaldhara Water Atm With Platform And Soakpit Operating By Solar System Near Ho Jinarul Sk At Digha Patpukur S X 2026-05-04
India Installation Of Sajaldhara Water Atm With Platform And Soakpit Operating By Solar System Near Ho Sabirul Pandit S Xvii 2026-05-04
India Repair And Maimtanance Of Sajaldhara And Tube Well At Dogachhia Gp Area 2026-05-04
India Power Contactor 25 Amp 3 Pole .#* Power Contactor 25 Amp 3 Pole, Auxiliary Contact: 1 No+1 Nc, Mounting - Din Rail, Coil Volta ge: 240 V Ac, Contact Voltage - 480v Ac, 50hz, Add On Block: Front, Duty: Ac3, Standard Compliance - Iec 60947-4-1, Is 13947-4-1 2026-05-04
India Wire Fuse Tinned Copper Nominal Dia 0.914 Mm (20 Swg) To Is 9926/1981/ .#* Wire Fuse Tinned Copper Nominal Dia 0.914 Mm (20 Swg) To Is 9926/1981/ [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : 2026-05-04
Whats app