Filter Search


Asia


Location Summary Deadline
India Doorway Grab Rail Complete .#* Doorway Grab Rail Complete As Per Drg. No.-dmu/tc/v/ss-6-4-007, Alt-cr, Item No.-1,2,3,4 In assembled Condition For Col.-i [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-05-16
India Control Card Spmcuc For Recorder, Scale Range 0-180 Kmph As Per M/s Medha Part no Sp922101014 (mrt922 Ver-2). .#* Control Card Spmcuc For Recorder, Scale Range 0-180 Kmph As Per M/s Medha Part No Sp92 2101014 (mrt922 Ver-2). [ Warranty Period: 30 Months A 2026-05-16
India The Work Of Upgrading The Connecting Road From The House Of Olympian Shri Akhil Kumar To Bhairopur Tikra. 2026-05-16
India Renewal Of Mahtoli Gohani Road (km.4) To Bhupaiya Amrahat Link Road (vr) (km.1 And 2(0-800). 2026-05-16
India Pananchery Gp Pro No 572/2025-26 Drainage Construction In Vadakkemoola Post Office Road -ward 05 2026-05-16
India -completion Of Building For Vadakkangara Sub Centre 276-26-ward 8-makkaraparamba Gp 2026-05-16
India Hsfg Bolting Assembly As Per Rdso .#* Hsfg Bolting Assembly As Per Rdso Bs-111 (rev-7) With Bolt M22 X 110 Mm As Per En-1439 9 Part-3 Grade Hr10.9 (1no.), Nut As Per En-14399 Part-3 Grade Hr 10 (1 No.), Plain Washer As Per En-143 99 Part-5 (1 No.) And Dti 2026-05-16
India Tungsten Carbide .#* Tungsten Carbide Tipped Alloy Hole Saw Cutter With Pilot Drill Bit Suitable To Cut Steel, Wood And Pvc Of dia 62mm & Depth Of 25mm [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-05-16
India The Tender Involves The Supply Of Neoprene Rubber Sheets In Two Categories: 50 Kilograms And 75 Kilograms. The Sheets Are Required To Meet Specific Technical Parameters Including Dimensions And Material Specifications. Neoprene Rubber Sheet (50 Kg), Neopr 2026-05-16
India Construction Of Road And Drain From Inderjeet To Ashok Vakil, Ward No.03 Mc Palwal 2026-05-16
Whats app