Filter Search


Asia


Location Summary Deadline
India Project No65/26 Side Protection Works To Eengaamkuzhy Thodu In Ward No 11 #*. Project No 65 Side Protection Works To Eengaamkuzhy Todu In Ward No 11 2026-05-15
India Project No 11/26 Concreting Of Kulamb Akkare Thodu Road In Ward No 20 #*. Project No 11/26 Concreting Of Kulamb Akkare Thodu Road In Ward No 11 2026-05-15
India Project No 92/26 Improvement Works To Malayil Nooriyaabaad Road In Ward No 11 2026-05-15
India Project No 251/26 (so 354/25)improvement Works Panchikund Madhavi Padi Naduthodi Subramanian Padi In Ward No 15 #*. Project No 251/26 (so354/25) Improvement Works To Panachikund Madhavipadi Naduthodi Subramanian Padi Road In Ward No 15 2026-05-15
India Project No 38/26 Concreting Of Pilaathara Mullanmada Road In Ward No130 #*. Project No 38/26 Concreting Of Pilaathara Mullanmada Road In Ward No 13 2026-05-15
India Project No 39/26 Thuvvappara Ossan Kunhimohammed Road In Wad No 11 #*. Project No 39/26 Concreting Of Thuvvappara Ossan Kunhimohammed Road In Ward No 11 2026-05-15
India Project No 44/26inter Lock Works To Karimban Moochikkal To Kavil Kulamb Road In Ward No 15 #*. Project No 44/26 Inter Lock Works To Karimban Moochikkal Kavil Kulamb Road In Ward No 15 2026-05-15
India Project No 54/26 Concreting Of Mes Kolamthuruthi Road In Ward No 19 #*. Project No 54/26 Concreting Of Mes Kolamthuruthi Road In Ward No 19 2026-05-15
India Hex Head Bolt, Castle Nut With Washer And Split Pin. .#* Hex Head Bolt, Castle Nut With Washer And Split Pin As Per Rdso Drg. No. Skel-5004, Alt -2 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , It 2026-05-15
India Hose Clamp 150., As Per Drawing: Is:4762 .#* Hose Clamp 70a Worm Drive Galvd., As Per Drawing: Is:4762-1984 Table-1, Packin g Instruction: Suitably Packed In Jute Bags, Quality Plan: N.a. [ Warranty Period: 30 Months After the Date Of Delivery ] ] 2026-05-15
Whats app