Filter Search


Asia


Location Summary Deadline
India Plain Copier Paper (v3) Isi Marked To Is 14490 2026-04-30
India Job Work For Preparation Of Hardstand Using Polymer Concrete Composite 2026-04-30
India Dynamic Virtual 3d Terrain Models 2026-04-30
India Toner Cartridges / Ink Cartridges / Consumables For Printers,toner Cartridges / Ink Cartridges / Co 2026-04-30
India Tender Invited For Hydrazine Hydrate(80% )##quantity: 7000## 2026-04-30
Bhutan Contract Awarded For: Monsoon Restoration Works Under Rollong Subdivision 1) Construction Of Rrm R/wall Along Kheri-yadi Pnh At Chainage 38.2km (8m*3m). 2) Construction Of Rrm R/wall With Toe Wall Along Shermung Dr At Chainage 17.28 Km (8m*3.5m). Monsoon 2026-04-30
India Unf Flexible Conduit Nw36 Dia 40mm .#* Flexible Conduit Nw 36 (dia 40mm Metric Threads) To Specn.no.rdso/pe/spec/ ac/ 0138 - 2009,rev-1. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-04-30
India Unf Flexible Conduit Nw36 Dia 40mm .#* Flexible Conduit Nw 36 (dia 40mm Metric Threads) To Specn.no.rdso/pe/spec/ ac/ 0138 - 2009,rev-1. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-04-30
India U Upper Stop Plate Lhb Eog .#* Upper Stop Plate To Drg.no.aaa03225. (rcf Pl.no.33509580) Special Condition : S uitable Packing To Be Done To Avoid Damage During Transit, Unloading And Rust Preven tion During Storage. [ Warranty Period: 30 Months After The 2026-04-30
India U Upper Stop Plate Lhb Eog .#* Upper Stop Plate To Drg.no.aaa03225. (rcf Pl.no.33509580) Special Condition : S uitable Packing To Be Done To Avoid Damage During Transit, Unloading And Rust Preven tion During Storage. [ Warranty Period: 30 Months After The 2026-04-30
Whats app