Filter Search


Asia


Location Summary Deadline
India Supply Of Carbon Dioxied Gas (co2) Grade-i To Is No. 307/66 #*. Carbon Dioxied Gas (co2) Grade-i To Is No. 307/66,2nd Revision,reaffirmed-2006 . Specn: Is No. 307/66,2nd Revision,reaffirmed-2006 . [ Warranty Period: 30 Months After The Date Ofdelivery ] ] 2026-03-31
India Supply Of S & I Of Pipe Sealing Arrgt/lhb Non Ac #*. Supply And Installation Of Pipe Sealing Arrangement For One Lavatory Of Lhb Non Ac Coaches To Drg.no.icf/std-6-3-122, Item-4, Alt-b And As Per Specn.rdso/2008/el/spec/0067, Rev-03. [ Warranty Period: 30 2026-03-31
India Supply Of S & I Of Pipe Sealing Arrgt/lhb Non Ac #*. Supply And Installation Of Pipe Sealing Arrangement For One Lavatory Of Lhb Non Ac Coaches To Drg.no.icf/std-6-3-122, Item-4, Alt-b And As Per Specn.rdso/2008/el/spec/0067, Rev-03. [ Warranty Period: 30 2026-03-31
India Supply Of Adhesive For Lhb Coaches (suitable Between 5 To 48 Deg.celcius Temp) In 300/310 Ml Tube-packing Or Sausage Packing, As Per Make/brand: Sikaflex 265 Of M/s.sika Or Terostat 8590 Of M/s Henkel Or 08609 Windo-weld Super Fast Urethane Of M/s 3m For 2026-03-31
India Supply Of Ls Shell Kit #*. Shell Kit Items For Lws (752) Coaches A) One Coach Set Of Roof, 2 Mm Sidewall And End Wall 1)roof Assembly To Drg No 75216001, Alt 'nil' - 1 No. 2)end Roof Assembly To Drg No 58116066, Alt 'g' - 2 Nos. 3)sidewall To Drg No 75214 2026-03-31
India Supply Of Ls Shell Kit #*. Shell Kit Items For Lws (752) Coaches A) One Coach Set Of Roof, 2 Mm Sidewall And End Wall 1)roof Assembly To Drg No 75216001, Alt 'nil' - 1 No. 2)end Roof Assembly To Drg No 58116066, Alt 'g' - 2 Nos. 3)sidewall To Drg No 75214 2026-03-31
India Supply Of Ls Shell Kit #*. Shell Kit Items For Lws (752) Coaches A) One Coach Set Of Roof, 2 Mm Sidewall And End Wall 1)roof Assembly To Drg No 75216001, Alt 'nil' - 1 No. 2)end Roof Assembly To Drg No 58116066, Alt 'g' - 2 Nos. 3)sidewall To Drg No 75214 2026-03-31
India Supply Of Igbt Based 3-phase Drive Propulsion Equipment With Physical Medium #*. Igbt Based 3-phase Drive Propulsion Equipment With Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (mvb) As Per Iec 61375, Terminal Bracket, Bus Bar Link An 2026-03-31
India Plastering Of Statues, Gate, Painting As Well As Barricading As Per Schedule, (where Necessary In The City) & Other Minor Works For The Year 2024-25, Faizpur Municipal Council For Construction Department, N.p. Property, As Per Requirement In The Village. 2026-03-31
India Providing & Delivery Of Excavated, Sand & Murum To Faizpur Municipal Council For Construction Department. 2026-03-31
Whats app