Filter Search


Asia


Location Summary Deadline
India Subconsultancy Work For Architectural, Structural Design And Mepf Services For The Proposed New Kalyan Station In Connection With Detailed Design Engineering Consultancy For Yard Remodelling Work At Kalyan Station Of Central Railway Under Mutp-iii A 2030-02-27
India Construction Of 100 Bedded New District Hospital In Narayanpur. 2030-02-28
India Construction Of 100 Bedded New District Hospital In Azara 2030-02-28
France design and build for the separation of the red and green lines of the 28 May station, part of the metro system 2030-02-28
Qatar Supply jet fuel from Ras Laffan Industrial City to the Hamad International Airport (HIA) in Doha. 2030-02-28
India Design, Procurement, Supply, Installation, Construction, Testing & Commissioning Of All Civil, Electrical, Mechanical & Instrumentation Works Etc Complete For Animal Crematorium At Bhandewadi In City Along With Operation & Comprehensive Maintenance Of The 2030-03-01
India Transportation Of Indane Lpg Cylinders In Vertical Position On Unit Rate Basis Ex Guna Lpg Bottling Plant 2030-03-02
India Supply Of Axle Pulley Rubber Pad #*. Axle Pulley Rubber Pad For 4.5 Kw Alternator As Per Rdso Drg. No. Rdso/pe/sk/tl/0084-2005 Rev.-0 With Latest Alteration [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2030-03-04
India Construction Of Liaisoning Office Along With Allied Development Works At Raipur On Turnkey Basis Including Maintenance For 5 Years During Defect Liability Period (dlp) 2030-03-04
India Supply And Installation Of (-)860c Vertical Deep Freezer Laboratory Instruments And Equipments At Departmental Water Quality Testing Laboratories In Uttarakhand. 2030-03-05
Whats app