Filter Search


Asia


Location Summary Deadline
Qatar Hire Of Lab/sampling Technicians For Qgn, S & Barzan For 7 Years From 1/7/22 2029-07-01
Qatar Hire Of Lab/sampling Technicians For Qgn, S & Barzan For 7 Years From 1/7/22 2029-07-01
India Camc Of Auma Make Actuators On Dbbvs And Movs At Cochin Terminal, Irumpanam 2029-07-02
India Design, Engineering, Procurement And Supply, Construction And Erection, Testing, Commissioning, Associated Transmission System And Comprehensive O And M For 5 Years Of 25 Mw (ac) Solar Pv Power Plant At Bhojudih Coal Washery, Bccl, Purulia Wb 2029-07-02
India Induction Of 30 Nos. 342 Capacity (cat-i) Packed Lpg Cylinder Trucks At L-1 Rates For Transportation Of Lpg Cylinders, Ex-kalyani Bp. There Is An Immediate Requirement Of Total 30 Nos. 342 Capacity Additional Packed Trucks For Kalyani Bottling Plant. Inte 2029-07-03
India Supply, Installation And Operation Of One Number Pitless Electronic Weighbridge (60mt) At Durgapur Terminal On Bot Basis For 10 Years. 2029-07-03
India Induction Of 20 Nos. 200 Capacity (cat-iii) Packed Lpg Cylinder Trucks At L-1 Rates For Transportation Of Lpg Cylinders, Ex-raninagar Bp. The Requirement Includes 5 Nos. For Distributor (own Use) And 15 For Transporter Trucks. Interested Transporters And 2029-07-04
India Introduction Of Continuous Miner Package At Kumardih-b Underground Mine Of Bankola Area Of Ecl On Hiring Basis. 2029-07-06
India Installation Of Air Breaker Switch 1200 Amps Of Bhimkanali Sinidih Colony Sub-station Of Block-ii Area 2029-07-09
India Various Work At Sant Gyaneshwar Samadhi Garden, Sakkardara With Five Year Maintenance. (2nd Call) 2029-07-10
Whats app