Filter Search


Asia


Location Summary Deadline
Italy Acquisition Of 49% Of Adnoc Gas Pipelines, A Company Controlled By Adnoc With An Enterprise Value Of $ 20.7 Bln, Which Manages The Infrastructure That Connects The Production Sites To The Network And Export Terminals 2040-06-30
India Maintenance Of C.c. Passage At Bye-lanes Of Kanchantala Road And Jelia Para Road Near Rp. Nos. Z-5/32/1, Z-5/35/b, Etc. In Ward No. 141, Br-xv. 2040-07-26
India Operation And Management Of Domestic Air Cargo Terminal At Birsa Munda Airport 2040-07-26
India Construction Of Cement Road In Malegaon Camp Benival Corner To Ganesh Mandir And Parisar At Malegaon 2040-07-26
India Operation And Management Of Domestic Air Cargo Terminal At Raipur Airport 2040-07-26
India Construction Of Deep Tube Well At A) Awc At Dhangdhingguri Gp Near Kalbar Barman Land, B) Chhotorangrash Paschimpara Awc And C) Chhotorangrash Madrasah. 2040-08-17
Philippines Supply the island's main grid with 20 megawatts. 2040-09-30
India Development, Operation And Maintenance Of Wayside Amenities On Lease Basis (5 O-m Sites),(nh-752d/ Ujjain-badnawar/88-390/ Lhs/panchakwasa /mp) 2040-10-03
India Development, Operation And Maintenance Of Wayside Amenities On Lease Basis (5 O-m Sites),(nh-752d/ Ujjain-badnawar/88-390/ Rhs/panchakwasa /mp) 2040-11-02
India Development, Operation And Maintenance Of Wayside Amenities 4 O-m Sites In Karnataka And 3 O-m Sites In Telangana, 4 O-m Sites In Tamil Nadu And 8 O-m Sites In Andhra Pradesh (19 O-m Sites)nh16/ 66-800 A1-a2/ Lhs/ Devrapalli Byepass/ Andhra Prade 2040-11-21
Whats app