Filter Search


Asia


Location Summary Deadline
India Tender Invited For Lube Oil 15w40 With Specification( Api Ci-4 Or Ci-4 Plus), Make- Iocl, Bpcl, Hpcl, Volvoline [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-04-20
India Supply Of Hood For Smoothing Reactor Etc #*. Hood For Smoothing Reactor (sl -30) Of Conventionl Locos As Per Clw Drg. No.- (i) 05/1/50/441 Alt.7 (ref.1 To 27,37,42,43,44 &46 To 52),(ii) 05/1/50/440 Alt .8,(iii) 05/3/50/292 Alt.4 And Conforming To Clw Spcc 2026-04-20
India 1) Hemospray (include The Gun Delivery System And The Catheter System, Compatible With The 2.7mm And 3.8mm Working Channel Endoscopes, Preloaded Co2 Cylinder Mechanism For hemospray, Catheter Diameter Should Vary From 7fr To 10fr, Length Should Be More Th 2026-04-20
India Tender Invited For Modified Cow Catcher Assembly #*. Modified Cow Catcher Assembly For P4 Loco To Clws Drg. No.03/1/62/83 Alt.6 And 03/1/62/84 Alt .7 Along With Clws Specn. No. Clw/ms/3/154.alt 2 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-04-20
India Supply Of 45974640: Freedom Series Power Contactor Three Pole 16amp, 415v, 50hz, Coil Voltage 110v Ac, Aux Contact 1no + 1nc Complete With Top Mounted Add On Block 2no + 2nc, Conf. To Rdso Spec. No. Elps/spec/ac/04 (rev 2026-04-20
India Supply Of Guide Disc To M/s Escorts Drg No : So 4400201 As Per Escorts Manual No. Sa/tv (modified)/01 Alt : Na. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation 2026-04-20
India Twin Tower Heat Less Regenerating .#* Twin Tower Heat Less Regenerating Type Air Dryer As Per Drg No 11810725, Alt-c, as Per Rdso Spec No Mp.0.01.00.06 Rev -06, Mar-2021 [ Warranty Period: 30 Months After The Date Of delivery ] ] 2026-04-20
India Breather Assembly With Gasket For Gear Case Of Wap-7 Loco As Per sr.dee/trs/gzb Drg. No. 180/3- Phase/2008 Alt-nil .#* Breather Assembly With Gasket For Gear Case Of Wap-7 Loco As Per Sr.dee/t rs/gzb Drg. No. 180/3- Phase/2008 Alt-nil [ Warranty Period: 3 2026-04-20
India Supply Of Spring For Friction Bolster Device #*. Spring For Friction Bolster Device As Per . Clw Drg No.03/4/16/3/alt-7. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-04-20
India Tender Invited For Air Filter Element For Emu Traction Motor Icf Drg.icf/sk-6-4-035 (alt. X) Or Latest. #*. Air Filter Element For Emu Traction Motor Icf Drg.icf/sk-6-4-035 (alt. X) Orlatest. [ Warranty Period: 30 Months After The Date Of Delivery ][quant 2026-04-20
Whats app