Filter Search


Asia


Location Summary Deadline
India Cleaning And Sweeping Of Mlwb Office Buildings In Chatrapati Sambhaji Nagar Region. 2027-02-04
India Construction Of 14nos. Complete Isolation Stoppings (fly-ash Bricks) Including All Con-struction Materials In Cm Panel W7 Depillar-ing Panel Of Bagdona Seam At Tawa Mine, Pathakhera Area, Wcl. 2027-02-04
India Operation,maintenance And Management Of Amenity Parking Lot Situated At Plot Bearing Cts No. 1/b, In Village Majas, Jvlr, Jogeshwari (east) In K/east Ward Undercategory B 2027-02-04
India Supply Of Supply, Installation And Commissioning Of Electro-pneumatic Pressuried Flushing System For 250 Lhb Coaches (1000 Lavatories).the Material Shall Be Supplied As Per Specification: Mmdts 19027 Rev.03 Or Latest And Follow Drg No.mi007851 Alt Nil Or 2027-02-04
India Supply Of 60060438: Switch Portion Sleepers 60 Kg 1 In 12 Layout Rt-4512 To Rt-4538 Sl. No. 01 To 27 Which Are Under Switch Portion Sleepers 60 Kg 1 In 12 Layout. Specification No: Irs-t-45 (fourth Revision-march 2021) W 2027-02-04
India Gardening And Landscaping Maint - Comco Ipshem 2027-02-04
India Construction Of Main Thana Building At Police Station Revna Ghatampur, Distt Kanpur U.p. 2027-02-04
Bangladesh Contract Award For: Widening And Strengthenting Of Torabgonj Gc-shantirhat-banderhat-chowdhuryhat-ramgati Bazar Road At Ch. 3900-12620m Road Id No. 451742006. Under Komolnagar Upazila, Laxmipur District. Value Of Recovered Material Tk = 26,68,586.00 [komo 2027-02-04
India Engagement Of Agency For Display Of Advertisement On Existing Public Toilet/community Toilet At Different Locations (third Call) 2027-02-04
India Supply Of 60060438: Switch Portion Sleepers 60 Kg 1 In 12 Layout Rt-4512 To Rt-4538 Sl. No. 01 To 27 Which Are Under Switch Portion Sleepers 60 Kg 1 In 12 Layout. Specification No: Irs-t-45 (fourth Revision-march 2021) W 2027-02-04
Whats app