Filter Search


Asia


Location Summary Deadline
India S&i Under Frame Cable Duct And Pipe Lwscz .#* Supply And Installation Of Under Frame Cable Duct And Pipe Mounting To Drg. No.lw scz-7-1-002/col-i And Ii, Alt-e. For Lwscz & Lwscn Coaches. [ Warranty Period: 30 Months After The Date O f Delivery ] ] 2027-01-29
India Supply Of 33710016: Supply And Installation Of Under Frame Cable Tray And Pipe Mounting Arrangementfor Lslrd Coaches Without Da Set To Drg.no.lslrd-7-1-002 Alt-d. 2027-01-29
India Kit For Check Valve With Choke Consisting Of 4 Items. .#* Kit For Check Valve With Choke Consisting Of 4 Items. Drawing No: Rdso Drg. No. Sketc h-98112, Alt. Nil, Item Nos. Details As Per "annexure-a". Matl.& Specn : As Per Drawing And Conform ing To Appe 2027-01-29
Bangladesh Contract Award For: Piped Water Supply Scheme With 02 Nos Test Tubewell, 02 Nos Production Well, 02 Nos Pump House, 01 Nos R.c.c Over Head Water Tank, Mechanical Works, Electrical Works, Pipe Line/water Distribution Networks Etc. At Dhanbari Upazilla, Tan 2027-01-29
India Mtc Of Arws Rws Nrdwp Ridf Etc. Dws Division, Agartala-ii Sh Hiring Of 1 No. Maruti Eeco With Petrol Driven Vehicle For 1 Year To Performing Official Duties For Superintending Engineer Under The Office Of The Chief Engineer, Dws Agartala Year 25-26 #*. Pl 2027-01-29
India Supply Of Brake Chopper Resistor Units Designed For The Vande Bharat Express, Adhering To Specific Medha Spare Part List Standards. Brake Chopper Resistor Unit 2027-01-29
Bangladesh Contract Award For: Construction/ Reconstruction Of Dharmapasha Gc To Joysree Gc Road From Ch. 1100m To 10715m Road Id. 690322001.. A. Road Surfacing Work . B. Road Protection . C. Construction Of 16.00m Long Rcc Girder Bridge From Ch. 1425 To 1441m. D. C 2027-01-29
India Preparation, Revision And Maintenance Of All Relevant Manuals As Required By Dgca/bcas Etc. 2027-01-29
India Repairing And Providing Of Dosing Arrangement, Valves, Air Compressors, Blowers, Washing, Replacing Of Filter Media Etc. Of Package Type Irps Of Different Dtw Schemes Under Smc Under Dws Sub-division Santirbazar During The 2025-26. 2027-01-29
India Comprehensive Annual Maintenance Contract For Terminal Automation System At Barauni Terminal Under Bihar State Office For A Period Of Three Years 2027-01-29
Whats app