Filter Search


Asia


Location Summary Deadline
India Work Of Operation And Management Of Chalit Rasoi Kendra Under Deendayal Rasoi Yojana Third Phase. (2nd Call) 2027-03-31
India Petrol ?? ????? ?? ??? 2027-03-31
India Supply Of Recombinant Human Erythropoietin 5000 Iu Injection ] 2027-03-31
India S&i-ep Brk.eqp- For Memu/dmc/3ph And Memu/ndmc/3ph Coaches .#* Supply And Installation Of E.p Brake Equipment For Memu/ndmc/3ph Coaches to Rdso Specification Rdso/2013/cg-03 (latest Revision/amendment) And To Material Sche dule No. Icf/sk-10-2-697, Issue 2027-03-31
India Supply Of 47160184: 9 Kva Dry Type Distribution Transformer To Rdso/pe/spec/tl/ 0158 -2010 (rev.0) (type-1).avm Shall Be To Model No. Efm 2.65, M12 Of Resistoflux Or Equivalent Of Dunlop/ Mettalistic 2027-03-31
India Supply Of 77093343: Supply And Application Of Epoxy Zinc Phosphate Primer (two Pack)to Specn.rdso/m&c/pcn/100/2018, Rev. 02, Amend 1b, Chapter-ii, Packing Instruction: Pi042 Ver 1.0 2027-03-31
India End Wall (memu/tc) .#* End Wall For 3ph Memu/tc Coaches To Drg.no 911-1-5-001 Alt A Col.i - 1 No. 9 11-1-5-003 Alt A Col.i - 1 No. Firm Shall Fulfil The Manufacturing Facility As Per Icf/md/sp ec-315, Issue Status-01 Rev.00, Amendment-01. Special Conditio 2027-03-31
India Supply Of 30140626: One Coach Set Of Side Wall And Roof For 3ph Memu/tc Coaches I) Side Wall To Drg.no. 747-1-4-001 Alt 'nil' Col.i - 1 No. Ii) Roof Complete To Drg.no. 747-1-6-005 Alt 'nil' Col.i - 1 No. The Firm Shal 2027-03-31
India Supply Of 33539170: Supply Of Control Equipment For Air Suspension System For Lhb/eog Coaches To Material Schedule No. Icf/sk-10-2-674,issue Status-01, Rev-00 2027-03-31
India C/s Of Frame Work, Carline And Welding Parts (lws Ab) .#* One Coach Set Of Frame Work, Carline And Welding Parts For Amrit Bharat Lws/pp2 (754 ) To Drg Nos. 1. Frame Work To Drg Nos 75414009, Alt A - 2 Nos, 75414011, Alt Nil - 2 Nos. Details In column-i I 2027-03-31
Whats app