Filter Search


Asia


Location Summary Deadline
India Gas Ultra Pure Zero Air Iolar Gr1. .#* Gas Ultra Pure Zero Air Iolar Gr1. Each Cylinder Consisting Of 07 Cubic Meters. Note: 1) Gas To Be Delivere d To The Consignee In Every 15 Days (or) As When Demanded By The Consignee.2) Gas To Be Filled In 150 Bar Cy 2027-01-03
India Annual Plan 2025-26 -pro.no.267-pavaratty Gp -restoration Of Thathakulangara Kaluvappadam Road In Ward 10, 11 , 13 2027-01-03
India 192/26-2025-26 Thrissur Corporation Ollukkara Zonal Division 10 -laying Interlock Tile At Sastha Nagar Road Bylane 5 2027-01-03
India Rc 2 Phase 2 Zone 6 One Year Running Contract For Various Pwd Roads Under Roads Section Pothanicadu In Ernakulam District 6 Road Stretches For A Length Of 48 45 Km General Civil Work #*. Reactive Maintenance Pre Monsoon Works Proactive Maintenance 2027-01-03
India Construction Of Officers Hostel, Staff Hostel Alongwith Earth Filling, Drainage, Internal Road And External Water Supply At 132/33kv Gss, Aegcl, Hailakandi 2027-01-03
India Notice Inviting E-tender For License For Retail Outlet For Apparel Shop In Sha, Upper Ground Floor At Nitb, Vsi Airport 2027-01-03
India Supply, Installation And Commissioning Of Firewall With One Year Warranty Similar To sophos Xgs106 Or Better Make. .#* Supply, Installation And Commissioning Of Firewall With One Year Warranty Similar To Sopho s Xgs106 Or Better Make. [ Warranty Period: 3 2027-01-03
India Prj368/25construction Of Mcf Building Side Protection And Related Actiivities Css Cfc 7980000 2027-01-03
India Providing And Fitting Fixing Of Electrical Appliances (spare Parts) For Panel Board Of Different Dws Schemes Of Manu Rd Block Area Under Dws Sub-division, Manu Dhalai.(gr-ii) 2027-01-03
India Construction Of Rcc Cover Drain On Both Side Of Ramnagar Road No: Under Agartala Division -i, Pwd (r&b)/ Sh: Construction Of Rcc Cover Drain ,2.0 ,site Clearance ,dismantling Of Structures dismantling Of Existing Structures Like Culverts, Bridges, Retaini 2027-01-03
Whats app