Filter Search


Asia


Location Summary Deadline
Bangladesh Contract Award For: Installation Of Buried Pipe Line For 2.00 Llp (1500m Each) contract Value (taka): 784900.986 no. Of Tenders/proposals Sold: 18 no. Of Tenders/proposals Received: 15 tenders/proposals Responsive: 14 date Of Notification Of Award: 1 2026-06-30
India Annual Plan-kmc 2024-25 Pro.no.655-sn Poly Road To Ittammal Colony Road Re-tarring. 2026-06-30
India Detailing Shackles Assembled .#* Detailing Shackles Assembled With Connection Pin And Locking Washer Dia 3 0 Drg.no. 06/3/10/4 Alt-3 Ref. 1&3 And Clw Drg.no.ac-112 Alt-3. [ Warranty Period: 30 Month s After The Date Of Delivery ] ] 2026-06-30
Bangladesh Contract Award For: Improvement Of Akon Bari & West Site Of Road Graveyard Under Faridpur Union. [latitude: 22555438; Longitude:90.466104] Under Bakergonj Upazila , District : Barishal contract Value (taka): 285000.000 no. Of Tenders/proposals Sold: 41 2026-06-30
Bangladesh Contract Award For: Procurement Of Protein Concentrate, Anti-salmonila, Lysine, Limestone, Iodide Salt Zonal Poultry Farm Rajabarihat, Rajshahi contract Value (taka): 2869238.424 no. Of Tenders/proposals Sold: 3 no. Of Tenders/proposals Received: 3 te 2026-06-30
India E-tender Notice No-/323/2024-25 #*. Vihir Kholikaran Karane V Panipuravatha Anusarun Kame Karane Constructing Rcc Gsr 22000lit And Pipe Line 2026-06-30
India Kit For Constant Contact Pu Side Bearer Pad Assembly For Casnub 22 Nlb Bogie [design-b] .#* Kit For Constant Contact Pu Side Bearer Pad Assembly For Casnub 22 Nlb Bogie [desig n-b] Consisting Of [a] Poly Ring - 2 Nos/kit, [b]round Plate With Stopper Sprin 2026-06-30
Bangladesh Contract Award For: Extension Of Existing Upvc Underground Irrigation Line (buried Pipe) For Llp Scheme At Any Upazila Under Project Area (600m Each) contract Value (taka): 1188000.000 no. Of Tenders/proposals Sold: 15 no. Of Tenders/proposals Received 2026-06-30
India Latching Push Button Corridor Lighting .#* Latching Push Button Corridor Lighting Specn: Clw/es/3/0044 [ Warranty Period: 30 Mont hs After The Date Of Delivery ] ] 2026-06-30
China Contract Awarded For Wanto Town Urban Renewal Project bid Section Number: Glffjsz2026010012001002 winning Construction Period (days): 90; project Location:.wanto Town Urban Renewal Project 2026-06-30
Whats app