Filter Search


Asia-Pacific


Location Summary Deadline
India Supply, Installation, Testing And Commissioning (sitc) Of Additional Cctv Cameras, Integration With Existing Cctv System And Its Associated Works At Srinagar Airport 2026-03-05
Japan Purchase Of Stationery Etc. (fy2026) 2026-03-05
Malaysia Rfq 19505 Mat-bppx-0126 - To Replenish Spare Parts For Piping And Line Fittings (jan2026) 2026-03-05
India Auction Sale Of Property Residential Flat For Sale In Bankra 2026-03-05
India Overhauling Kit For 3/2-way Kaba .#* Overhauling Kit For 3/2-way Kaba Cock (ii53212) As Per Kbi Kit No.xki/kit/01586 Of Electric C cb System. One Set Consisting Of 16 Items. Item Detail As Per Annexure. [ Warranty Period: 30 Months Aft er The Date Of Deli 2026-03-05
-Procurement-Of-Drug-Items-(2026-28),for-Sskm-Hosptal,-Kolkata-20,-For-Two-Years-From-Date-Of-Award-Of-Contract>India -Procurement-Of-Drug-Items-(2026-28),for-Sskm-Hosptal,-Kolkata-20,-For-Two-Years-From-Date-Of-Award-Of-Contract>Wbhf/sskm/msvp/1116/ Pneumoccal Polysaccharide Vaccine 20 Valent
Procurement Of Drug Items (2026-28),for Sskm Hosptal, Kolkata-20, For Two Years From Date Of Award Of Contract
-Procurement-Of-Drug-Items-(2026-28),for-Sskm-Hosptal,-Kolkata-20,-For-Two-Years-From-Date-Of-Award-Of-Contract>2026-03-05
Japan Telecommunication Equipment Maintenance 1 Set 2026-03-05
India A/c: M/s Allied Protection & Manpower Services Private Limited, Branch: Narkulaganj 2026-03-05
India Fish Parlour Construction Work At Np Mangawan 2026-03-05
India Supply And Erection And Commissioning Of 01 No. Back Hoe Excavator With Back Hoe Bucket Of 2.0 To 2.5 Cum And Derated To 1.5 To 2.0 Cum Size Along With 2 Years Or 2000 Hrs. Initial Operation And Maintenance Spares, Whichever Is Earlier For Donimalai 2026-03-05
Whats app